On May 1,Xingtai City pipe street drainage and flood prevention facilities renovation project department came good news,steel road(Hundred Spring Avenue-Qili River)section officially opened.At this point,the total length of 6,362 meters of steel road(Quannan Street-Seven Mile River)to achieve the whole line,this cross-Xingtai city north and south of the main road new unveiled,to facilitate the public and tourists travel.
Steel Road is the core road of urban north-south commuting and regional linkage,and this section of the road is the last closed construction node of the renovation project.After the smooth operation of this section,the steel road transformation sub-item through the whole line,the north and south traffic no longer have the construction breakpoint,the mass travel conditions have been significantly improved.
As the core project of the renovation project of the drainage and flood prevention facilities of the municipal pipe street,the investment in the steel road sign section is large-scale and the construction task is heavy.The project department has promoted the construction of high standards,with a total of 300,000 square meters of road surface and 46,000 square meters of access roads,4949 meters of new rainwater ditches,2416 meters of rainwater pipelines,and 3,135 meters of sewage pipelines,which have strengthened the basic capacity of drainage and flood prevention along the route in an all-round way.
In the whole process of construction,the project department coordinated planning and scientific organization,and adopted the segmented operation mode of"closed paragraph,construction section,and traffic opening"to minimize the interference of construction on the daily travel of the public.In the stage from Baiquan Avenue to the end of the Seven Mile River,the project department coordinated human machinery,all builders 24-hour rotational duty,day and night,grab the construction node,as scheduled in May 1 to achieve the full line of traffic,effectively guarantee the convenience of citizens holiday travel.
After the transformation of the steel road flat and wide,the drainage system is fully upgraded,effectively solve the water problem of the road area in the rainy season,and the safety,smoothness and overall quality of the road traffic have been greatly improved.